121st Street South Streetscape Improvements

East Lake Sammamish Trail North Extension

Bell Street Protected Bike Lane

Cowen Park Historic Bridge

RapidRide H Line Non-Motorized Safety Improvements

Newport Way Non-Motorized Improvement Project

Revitalizing Tacoma’s Brewery District with Complete Streets: Phase I

Olympic Drive Non-Motorized Improvement Project

Pipeline Trail, Phase III Construction
In Tacoma, $1,936,057 would support construction of a 1.4-mile segment of the Pipeline Trail. The trail is already partially complete between E 48th St and E 56th St. Another segment will begin construction in 2018 linking up the trail at E 48th St with Tacoma Dome Station in Downtown Tacoma. The PSRC funding would take the trail as far south E 72nd St just outside of the Tacoma city limits. The trail will be paved with a minimum width of 10 feet and an additional two feet of gravel on each side. Other improvements include signage, benches, access control, light, and pedestrian-activated signals. Eventually, the Pipeline Trail is planned to stretch 14.5 miles providing regional non-motorized access in Pierce County.
44th Ave. W/I-5 Underpass Improvements
In Lynnwood, $255,672 would be dedicated to improving an I-5 underpass for people walking and biking. The underpass is located on 44th Ave W which is near Lynnwood’s burgeoning city center, the Interurban Trail, and future light rail station. The project would help construct a shared use path, add lighting, and improve crossings. Public art would also be installed to create a welcoming environment.
Sultan Pedestrian and Bicycle Bridge

Bremerton Transportation Center ADA Improvements
